• Project Brief
  • Student Work - Winter 2021
    • Nicolas Ajurias
    • Ahmed Ahmed
    • Heba Al Hallak
    • Maysa Al Khateeb
    • Amani Albalkhi
    • Brandon Bohlmann
    • Jetmir Bardhoshi
    • Eknoor Brar
    • Harveen Braich
    • Anwar Kassas
    • Erin Cassel
    • Mike Covill
    • Chris D'alphonso
    • Joaquin Diaz Ceballos Zavaleta
    • Antonio Farah
    • Julian Ferreira
    • Charles French
    • Mathew Gavac
    • Chenneil Goymer
    • Shiera Gutierrez
    • Harshvardhan Harshvardhan
    • Maria Kachi
    • Jeff Kaczmarek
    • Ethan Kennedy
    • Mitchell Lamb
    • Sam Lee
    • Laura Lozano Castaneda
    • Faith Marcelino
    • Qingzhou Meng
    • Vicky Nguyen
    • Zhihua Ni
    • Matthew Race
    • Jaimin Patel
    • Louie Ryu
    • Jaden Samuels
    • Faten Shaaban
    • Bushra Shaikh
    • Victoria Silva
    • Zizhou Tang
    • Naomi Taniguchi
    • Lucas Tavares Santos Consolino
    • Malachi Waskalik
    • Trevor Wilson
    • Matthews Woldemichael
    • Alicia Malubag
    • Aditi Desai
    • Jiazhi Wu
    • Leah D. Ausborn

Paisley mills Bakery

2/28/2021

2 Comments

 
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture

3D Wall section on building extension 

Picture
The 3D wall section shows the design of the wall I have chosen to be used in the new Addition to the bakery. The new wall Material chosen is CEI Materials C2000 concealed adjustable bracket panel systems which feature high pressure laminate panels facing the exterior of the building, this preserves the old look of the building which was originally wood planks facing the exterior and lets it match the connecting building while also giving more stability, and durability for use as a mercantile occupancy. The HPL panels are supported by a bracket system that is held away from the main wall and is concealed to give a more natural look, with the aluminum and steel holding the panels being concealed to the public and the elements. the new roof also matches that of the old roof and butts up to the wall that is the rest of the building, sealant and gaskets can be placed around this part of the roof/wall connection to better seal the new addition and make it feel more like it was originally apart of the building.  
2 Comments

    Nicolas Ajurias

    Hello! I am a student at Sheridan college and this is my conceptual Project.

    Archives

    February 2021

    Categories

    All

    RSS Feed

Powered by Create your own unique website with customizable templates.
  • Project Brief
  • Student Work - Winter 2021
    • Nicolas Ajurias
    • Ahmed Ahmed
    • Heba Al Hallak
    • Maysa Al Khateeb
    • Amani Albalkhi
    • Brandon Bohlmann
    • Jetmir Bardhoshi
    • Eknoor Brar
    • Harveen Braich
    • Anwar Kassas
    • Erin Cassel
    • Mike Covill
    • Chris D'alphonso
    • Joaquin Diaz Ceballos Zavaleta
    • Antonio Farah
    • Julian Ferreira
    • Charles French
    • Mathew Gavac
    • Chenneil Goymer
    • Shiera Gutierrez
    • Harshvardhan Harshvardhan
    • Maria Kachi
    • Jeff Kaczmarek
    • Ethan Kennedy
    • Mitchell Lamb
    • Sam Lee
    • Laura Lozano Castaneda
    • Faith Marcelino
    • Qingzhou Meng
    • Vicky Nguyen
    • Zhihua Ni
    • Matthew Race
    • Jaimin Patel
    • Louie Ryu
    • Jaden Samuels
    • Faten Shaaban
    • Bushra Shaikh
    • Victoria Silva
    • Zizhou Tang
    • Naomi Taniguchi
    • Lucas Tavares Santos Consolino
    • Malachi Waskalik
    • Trevor Wilson
    • Matthews Woldemichael
    • Alicia Malubag
    • Aditi Desai
    • Jiazhi Wu
    • Leah D. Ausborn